ChillSizer Knowledge Base

Everything needed to design, build and operate the system.

Start with the system, then go deep on tubs, chillers, pumps, filters, plumbing, cost, commissioning and maintenance.

1Define the vessel

Volume, insulation, ports and environment.

2Size cooling

BTU, target, climate and cooldown.

3Protect flow

Pump curve, filtration and plumbing.

4Commission & maintain

Prove performance and keep the baseline.

Start here

Cooling & equipment

Build & plumbing

Operate & troubleshoot

Water care

General education without unsupported sanitation claims.

How to use the Knowledge Base

Do not read every page before starting. Use the page that matches the next irreversible decision: vessel first, then cooling, then flow/plumbing, then commissioning.

If you already own equipment

Use the System Designer, then read the plumbing, filtration and commissioning guides for the bottleneck the result identifies.